Solutions to problems of corrosion & fouling

Below is a list of applications where our clients had problems with rust, corrosion lime scale amd bio-fouling. As usual Merus Technology was the Solution to each Problem.

As no two systems are ever exactly the same, results will vary from application to application. Flow characteristics, temperatures, electrical installations and varying water qualities each have an influence on the quality of the results and the time it takes to achieve these results. Some system types will take longer than others to observe results. In many cases results may be observed at around 30 - 50 days. Sometimes results are as fast as 2 weeks. The point is that different applications behave differently.